carl105
carl105 carl105
  • 04-04-2016
  • Mathematics
contestada

what is In 7 days, a group of workers can plant 21 acres. What is their rate in acres per day?

Respuesta :

kelpel197
kelpel197 kelpel197
  • 04-04-2016
So do 21/7 to give you how much they do in a day. The answer is three so they do 3 aceres in a day.
Answer Link

Otras preguntas

an ultrasound wave vibrates at 30,000 times a second state the frequency of the wave.
What is 20 dived 360 long division step by step
What is the most precise method for recording data points during an experiment? A. plotting the data point on an X-Y graph B. creating a pie chart for each o
All waves transfer what? a. energy b. matter c. energy and matter
Which of the following lists arranges the colors of light from highest energy to lowest energy? a. red, green, blue b. blue, green, red c. green, red, blue
The mla format for citing a book has four parts, beginning with the author's name. what appears in the third position? a. place of publication b. title c. da
How do I do this I am confused
Can certain traits disappear in a family? Why or why not?
Which title of a song is handwritten correctly? A. "The Star Spangled Banner" B. The Star Spangled Banner C. The Star Spangled Banner
what are property in algebraic expressions