Sadeghshakeri97 Sadeghshakeri97
  • 02-12-2019
  • Mathematics
contestada

60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

It takes A 12 days to make a batch of machine parts alone and B 18 days to make them alone. After 6 days of cooperation, A has some other things to do and left
Which of the following actions should you take as the first step in responding to an infant with mild FBAO? A. Checking that the child is crying, coughing, and
Can someone help me with this question? Thank you
17. Oscar, Lily and Jack collect souvenir coins. Oscar has 44 more coins than Lily and 48 more coins than Jack, Oscar has 6 more coins than Lily and Jack combin
,SJhfgaiuehrg;oiaerhgoaw ?
hel pls pls help me i need help
How I can answer this question, NO LINKS, if you answer correctly I will give u brainliest!
I am sure it......... happen.(will,would,can,could)​
19 When alpha particles are incident on a thin metal foil, most of them pass through undeviated. What does this observation reveal about the nature of the atom?
Simplify 5 x 52 leaving your answer in index form.