Paytonandbelladog3
Paytonandbelladog3 Paytonandbelladog3
  • 01-10-2020
  • History
contestada



In a cost-benefit analysis done by a government, "cost" is defined as

O something positive
O a wise choice
O something negative.
O a bad choice

Respuesta :

grizzlyandmia19
grizzlyandmia19 grizzlyandmia19
  • 01-10-2020

Answer:

O Something negative

Explanation:

Answer Link

Otras preguntas

Rewrite 3x-y=-4 in slope-intercept form
What is the intersection point for this system of equations? x + y = 49 .10x + .25y = 7.45
Suppose X is a random variable where P(X = x) = 1/6 for x in the set {1, 2, 3, 4, 5, 6}. What is E(X)? A) 3.5 B) 2.5 C) 4.5 D) 1.5
Which statement is the most likely conclusion you can draw from the cause- and-effect relationship shown in the diagram? Cause The Industrial Revolution comes t
£35 in ratio 6 : 1 would be?
Can Someone Help Me With This Problem Please​
if branch can be used to compute an absolute value of a number. a) Trueb) False
How was the development of the steam engine in response to a fuel shortage?
An approach to land use planning that is concerned with issues in both the inner city and suburban areas and seeks to maximize conservation and resource-use red
How do you write 0.349 in word form