ginapogones6676 ginapogones6676
  • 02-07-2021
  • Business
contestada

A costing system that uses actual costs for direct materials and labor and predetermined overhead rates to apply overhead is called a(n)

Respuesta :

topeadeniran2 topeadeniran2
  • 07-07-2021

Answer: normal costing system

Explanation:

A costing system which uses the actual costs for direct materials and the labor and predetermined overhead rates to apply overhead is referred to as the normal costing system.

Normal costing system is the cost allocation method whereby cost is assigned to products which are based on the labor, materials, and the overhead which are used in their production.

Answer Link

Otras preguntas

During the Renaissance, along with the importance of God, who else did people had value?
what are at least 5 general PowerPoint guidelines that's you find useful and provide an example of how you would use each in real life setting
What Does "Turning of the Tide" Mean?
Write 3/5, 1 2/3, 15/7, 1/2, 2 5/8, and 9/4 in order from least to greatest!!!
Is Smoking in Japan Illegal? Please help me :)
luisa has 183 pennies. hert dad gives her 128 more write a number sentence to show many pennies luisa has now
Q: What is the indicated term of the arithmetic sequence? someone help!!!! a14 for 200,196,192... A: a. 148 b. 252 c. 144 d. 239
What are Radio Waves?
What do you think was the most serious problem faced by settlers in Virginia? Why?
Noah rows across a river that is 48m wide. The current carries him 15m downstream. How far does Noah actually travel?