When one party to a contract fails to perform as promised, it is called
a. bad faith.
b. liquidated damages.
c. breach.
d. litigation?

Respuesta :

Crazyanimegirl
Crazyanimegirl Crazyanimegirl
  • 02-05-2017
C.Breach   hope this help (:
Answer Link

Otras preguntas

what is the theme of the soul of the great bell
How are the private and public keys generated in the RSA algorithm?
who is eberechi chinonso favour​
_________ duct carry sperm to urethra
a system of two carts has a total initial momentum of 2kg m/s before a collision how much total momentum would the system of two carts have after the collision
HELPPPPPPPPPP PLEASEEEEEEEE!!
How do variations in temperature affect the altimeter?
Which algerbric expression represents this phrase the product of 40 and the distance to the finish line
what do vertical angles equal
Though some critical information such as how long such decisions were delayed and the number of alumni who were surveyed-is missing from the graph titled "The E