ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

solove. draw and lable a tape diagram to subtract tens. write the new number sentence.a. 23 - 9 = 24 - 10 =
The density of ice is 0.92 g/cm3. An ice sculptor orders a one cubic meter block of ice. What is the mass of the block? Hint: 1 m3 = 1,000,000 cm3. Give your an
Shandra's cat is 23.4 cm tall and 38 cm long. Express these lenghts in metres and in millimetres. Someone help me , I really need it for tomorrow and please exp
which is an example of a physical change* metal rusting*silver tarnishing* water boiling* paper burning
All living things are either Eukarya, Bacteria, or Archaea. These three broadest categories in the classification of life are called _______.
What is the complete predicate of the following sentence?sharon and Jason went for a walk then a bike ride
Who was the first person to walk in the moon
Description of what is an ecosystem
I need to factor 5a^2 + 7a + 6b^2 - 4b  but I can't figure it out.......could it possibly be prime?
Which of the following occurs during anaphase I of meiosis? (A) Formation of tetrads (B) Separation of homologous chromosomes (C) Crossing over (D) Separation o