Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

the values of each table represent a linear relationship. for each table, determine the slope of the line that would pasa through the given points.
Please help!!! Which of the following can be genetically engineered? plants animals micro-organisms all of the above Acid rain became a major transboundary envi
What's the factors for 83
I need the answers to this one
5. You buy some groceries that total $9.40. Calculate the total purchase cost if the sales tax is 4% on foods. $5.68 $8.23 $9.78 $8.25
Raised 12 sons, who became the 12 tribes of Israel
The matrix C=1,-2,-3,7 was used to encode a phase to 7,-28,-25,-35,-2,-21,107,90,123,17. find d-1 and use it to decode the matrix
4% of what number is 5
HELP WITH CIVICS PLEASE! :)
What is the difference between the Islamic Empire and the Byzantine Empire (other then Muslim and Christian)?